You don't have javascript enabled. Good luck with that.
Pencarian
Atasi Genangan, Pipa Besar Dipasang di Terowongan Cawang

Drainpipe Installed at Cawang Tunnel to Minimize Puddles

The drainpipe installation in Cawang tunnel, East Jakarta is a step to anticipate the emergence of puddles, especially when there is rain with high intensity.

It has been done and is hopefully able to minimize puddles. This is just temporary

According to Yoserizal, Section Head of Maintenance for East Jakarta Water Resources Sub-dept., the Light Rail Transit (LRT) contractors, PT Adhi Karya, carry out such drainpipe installation. Its installation is temporary during the LRT construction.

Antasari JLNT Drainpipe Repaired

"We've coordinated with PT Adhi Karya contractor to put up the pipe. It has been done and is hopefully able to minimize puddles. This is just temporary," he stated, Tuesday (7/11).

The pipe in the size of 8 inches with 80 meters length is installed from the end of the tunnel to a control tub on the sidewalk. When heavy rain and puddles occur, it will be used for discharging water by pumping.

In future, he added, there must be a waterway from micro channel on the side of Jalan MT Haryono towards connecting channel under the sidewalk. It aims to smoothen water flow when it rains.

Linked News
Popular News indeks
  1. Central Jakarta Administration Acts Swiftly to Handle Kebon Kosong Fire

    access_time02-06-2026 remove_red_eye1426 personFolmer
  2. Jakarta Waives Motor Vehicle Tax Fines and Title Transfer Fees

    access_time01-06-2026 remove_red_eye860 personAldi Geri Lumban Tobing
  3. Commemorating Vesak, Jakarta Lights Up with Illumination of Jakarta 2026

    access_time30-05-2026 remove_red_eye662 personBudhi Firmansyah Surapati
  4. Seniors Participate in Pasti Bisa Berkarya at MRT Stations

    access_time02-06-2026 remove_red_eye611 personAldi Geri Lumban Tobing
  5. Central Jakarta Government Responds Quickly to Fire Victims in Tanah Tinggi

    access_time04-06-2026 remove_red_eye484 personFolmer